Remodel bids that survive change orders
Remodels have more line items than any other trade — and every forgotten one comes out of your margin. Bid Buddy walks you phase-by-phase so demo, rough-in, and finish are all priced with the right markup.
Your estimate
Your bid is calculated as total cost ÷ (1 − margin) for a true margin.
Total job cost
$23,000.00
Recommended bid
$28,750.00
Profit
$5,750.00
Margin
20%
Ask the estimator
Describe the job — I'll build your line items.
Tell me about the job
Try "I'm bidding a 1,500 sqft roof tear-off and re-shingle" or "Set my margin to 25%".
Turn this estimate into a signed job.
Go Pro to save unlimited estimates to the cloud, reuse templates, and let AI write a client-ready proposal & bid with scope, timeline, and payment schedule — in seconds.
- AI proposal & bid writer
- Unlimited cloud saves
- Branded PDF bids
- Reusable job templates
Demo & protection
Floor protection, dust barriers, dumpster, disposal — a real cost even on a clean job.
Rough-in trades
Plumbing, electrical, HVAC subs. Get sub quotes and mark them up 15–20%.
Finish materials
Cabinets, counters, tile, fixtures. Let the customer pick the grade, then price it.
Permits & inspections
Never absorb these. Line-item them at cost + a small handling fee.
Markup & margin for kitchen & bath remodeling
Remodelers typically need 25–35% net margin to survive change orders and warranty callbacks. Price with markup on materials and subs, then verify the true margin.
Line items to include in every kitchen & bath remodeling bid
- Demo & protection
- Dumpster & disposal
- Framing & drywall
- Plumbing rough-in
- Electrical rough-in
- HVAC modifications
- Cabinets & counters
- Tile & flooring
- Fixtures & finishes
- Permits
Frequently asked questions
See other trades
Every trade has its own quirks. Browse the full library.
All trade guides